Skip to main content
Loading…
This section is included in your selections.

(1) For existing and future residences or facilities that are located within the Urban Growth Area of the City of Port Angeles and east of the City limits, the requirements of Chapter 13.08 CCC, Port Angeles Eastern Urban Growth Area (EUGA) Sewer System, are hereby incorporated by reference.

(2) For All Other Areas. When adequate public sewer services are available within 200 feet of the property line of a residence or facility, the Health Officer, upon the failure of an existing on-site sewage system, shall require hook-up to the public sewer system. The distance shall be measured along the usual or most feasible route of access (WAC 246-272A-025).

(3) The owner of a residence or other facility served by a Table IX repair, as described in WAC 246-272A-0280, shall abandon the OSS according to the requirements specified in this chapter and connect the residence or other facility to a public sewer system when:

(a) Connection is deemed necessary to protect public health by the Health Officer;

(b) An adequate public sewer becomes available within 200 feet of the property line of residence or other facility as measured along the usual or most economically feasible route of access; and

(c) The sewer utility allows the sewer connection.

(4) The Health Officer is authorized to require a new development to connect to a public sewer system to protect public health.

(5) The Health Officer shall require new development or a development with a failing system to connect to a public sewer system if it is required by the Comprehensive Land Use Plan or development regulations.