All required improvements shall be installed by the land divider after the County has granted preliminary approval and prior to final approval in accordance with the following procedures:

(1) For new public roads, work shall not begin until detailed plans, if applicable, have been approved by the agency of jurisdiction.

(2) For new public roads, work shall not begin until the agency of legal jurisdiction has been notified in writing in advance. If work has been discontinued for more than 10 days for any reason, it shall not be resumed until the agency of jurisdiction has been notified in writing. Required road and drainage improvements shall be constructed consistent with approved specifications and inspected by the Road Department. (See Typical Cross Section in CCC 29.30.200.) The Road Department may allow changes in typical sections and details if unusual soil or geologic conditions discovered during construction warrant a change. Required community sewer and water systems shall be constructed pursuant to approved designs. Additionally, such improvements shall be inspected and approved by the governmental agency with jurisdiction.

(3) Underground utilities, sanitary sewers, and storm drains installed in the road right-of-way shall be constructed before surfacing of streets. Stubs for service connections for underground utilities and sanitary sewers shall be placed so as to avoid disturbance of street improvements when service connections are made.

(4) A drawing showing required improvements as constructed shall be signed by the designer or installer, retained by the land divider and shall be submitted and filed with the Road Department upon completion of the improvements.

(5) Lot Grading. Grading and filling of lots in a land division having an average slope of 10 percent or more shall be in compliance with the most recent edition of the Uniform Building Code adopted by Clallam County, and comply with the Chapter 27.12 CCC, and the Clallam County Drainage Manual, if applicable.

(6) Minimum improvements required by this title shall be installed at the expense of the land divider prior to final approval.

(7) The County Road Department shall inspect and approve all required construction prior to final approval.