The procedure determining fire flow requirements for buildings or portions of buildings hereafter constructed shall be in accordance with this chapter.

(1) Scope. This section is the procedure for determining fire flow requirements for all buildings or portions of buildings and substantial alterations to all buildings, hereafter constructed. Fire flow requirements are site and building specific. The requirements of this section supersede any conditions, notes, or requirements on any plat that do not meet the requirements of this section.

Nothing in this section shall be deemed to reduce, replace, or waive any water system requirements in the Clallam County Code, including, but not limited to, minimum fire flow and hydrant spacing, nor shall a reduction or exception to fire flow and hydrant spacing requirements reduce or exempt fire flow requirements of this section.

(2) Fire Flow Requirements for Buildings. Prior to the issuance of a building permit for any building, portion of a building, or substantial alteration thereto, fire flow shall be provided in the amount required by this section, including UGA designations.

(a) The fire flow and duration requirements for buildings other than one- and two-family dwellings (R-3) and private garages or agricultural buildings (U) shall not be less than that specified in Table A.

(b) Exception: Buildings for which fire flow is 500 gallons per minute or less, following all applicable modifications, are exempt from fire flow requirements.

(3) Modifications.

(a) Fire Areas. Portions of buildings which are separated into one or more fire areas shall be constructed in accordance with the IBC.

(b) Fire Flow Reduction for Automatic Fire Sprinkler Systems. The fire flow requirement for buildings protected with an automatic fire sprinkler system installed with the water supply provisions specified in NFPA 13 may be reduced up to 75 percent. Fire flow requirements for buildings with a limited supply fire sprinkler system may be reduced 50 percent.

(c) Fire Flow Reduction for Central Station Fire Alarm Systems. The fire flow requirement for buildings protected throughout with an approved automatic fire detection system including approved, UL listed central station monitoring installed in accordance with the provisions of the IFC may be reduced an additional 250 gallons per minute.

Minimum Fire Flow – Table B 

Minimum Required Fire Flow and Flow Duration for Nonresidential Buildings

FIRE AREA (square feet)

x 0.0929 for m2

FIRE FLOW (gal./min.)2

FLOW DURATION (hours)

Type I-A, I-B1

Type II-A, III-A1

Type IV, V-A1

Type II-B, III-B1

Type V-B1

x 3.785 for L/min.

0 – 5,500

0 – 3,700

0 – 2,600

0 – 2,100

0 – 1,600

500

1

5,501 –
7,800

3,701 –
5,000

2,601 –
3,500

2,101 –
2,700

1,601 –
2,000

750

1

7,801 –
11,100

5,001 –
6,800

3,501 –
4,700

2,701 –
3,500

2,001 –
2,400

1,000

1

11,101 –
15,900

6,801 –
9,300

4,701 –
6,200

3,501 –
4,500

2,401 –
2,900

1,250

1

15,901 –
22,700

9,301 –
12,700

6,201 –
8,200

4,501 –
5,900

2,901 –
3,600

1,500

1

22,701 –
30,200

12,701 –
17,000

8,201 –
10,900

5,901 –
7,900

3,601 –
4,800

1,750

1

30,201 –
38,700

17,001 –
21,800

10,901 –
12,900

7,901 –
9,800

4,801 –
6,200

2,000

1

38,701 –
48,300

21,801 –
24,200

12,901 –
17,400

9,801 –
12,600

6,201 –
7,700

2,250

1

48,301 –
59,000

24,201 –
33,200

17,401 –
21,300

12,601 –
15,400

7,701 –
9,400

2,500

1

59,001 –
70,900

33,201 –
39,700

21,301 –
25,500

15,401 –
18,400

9,401 –
11,300

2,750

1

70,901 –
83,700

39,701 –
47,100

25,501 –
30,100

18,401 –
21,800

11,301 –
13,400

3,000

1

83,701 –
97,700

47,101 –
54,900

30,101 –
35,200

21,801 –
25,900

13,401 –
15,600

3,250

1

97,701 –
112,700

54,901 –
63,400

35,201 –
40,600

25,901 –
29,300

15,601 –
18,000

3,500

1

112,701 –
128,700

63,401 –
72,400

40,601 –
46,400

29,301 –
33,500

18,001 –
20,600

3,750

1

128,701 –
145,900

72,401 –
82,100

46,401 –
52,500

33,501 –
37,900

20,601 –
23,300

4,000

1

145,901 –
164,200

82,101 –
92,400

52,501 –
59,100

37,901 –
42,700

23,301 –
26,300

4,250

1

164,201 –
183,400

92,401 –
103,100

59,101 –
66,000

42,701 –
47,700

26,301 –
29,300

4,500

1

183,401 –
203,700

103,101 –
114,600

66,001 –
73,300

47,701 –
53,000

29,301 –
32,600

4,750

2

203,701 –
225,200

114,601 –
126,700

73,301 –
81,100

53,001 –
58,600

32,601 –
36,000

5,000

2

225,201 –
247,700

126,701 –
139,400

81,101 –
89,200

58,601 –
65,400

36,001 –
39,600

5,250

2

247,701 –
271,200

139,401 –
152,600

89,201 –
97,700

65,401 –
70,600

39,601 –
43,400

5,500

2

271,201 –
295,900

152,601 –
166,500

97,701 –
106,500

70,601 –
77,000

43,401 –
47,400

5,750

2

295,901 –
Greater

166,501 –
Greater

106,501 –
115,800

77,001 –
83,700

47,401 –
51,500

6,000

2

"

"

115,801 –
125,500

83,701 –
90,600

51,501 –
55,700

6,250

2

"

"

125,501 –
135,500

90,601 –
97,900

55,701 –
60,200

6,500

2

"

"

135,501 –
145,800

97,901 –
106,800

60,201 –
64,800

6,750

2

"

"

145,801 –
156,700

106,801 –
113,200

64,801 –
69,600

7,000

2

"

"

156,701 –
167,900

113,201 –
121,300

69,601 –
74,600

7,250

2

"

"

167,901 –
179,400

121,301 –
129,600

74,601 –
79,800

7,500

2

"

"

179,401 –
191,400

129,601 –
138,300

79,801 –
85,100

7,750

2

"

"

191,401 –
Greater

138,301 –
Greater

85,101 –
Greater

8,000

2

1Types of construction are based on the IBC.